KOWLOON-CANTON RAILWAY.
25111
IREC
REGE 15 JUL 07
British Section.
Revised Estimate of Line not including Workshops, Kowloon Station Building, Private Sidings or Deep Sea Wall.
Main Head. Sub Head. Estimate. Survey $45,000.00 Land 139,700.00 Formation A. Earthwork 2,342,204.00 F. Tunnels 3,208,415.00 C. Roads 88,500.00 Bridges A. Major 538,500.43 B. Minor 473,388.11 C. Culverts 88,882.00 V. Fencing A. Boundaries 31,818.00 B. Signs 398.00 VI. Telegraph 28,964.00 VII. Track A. Ballast 747,032.00 B. Permanent Way 154,110.00 223,398.25 39,580.00 2,410.00 VIII. Stations and Buildings A. Buildings and Fixtures 234,037.00 B. Station Machinery C. Furniture D. Workshops IX. Plant A. Construction B. Loco tools and Plant C. Carriage and Wagon D. Engineering X. Loco Rolling Stock F. C. & W. Rolling Stock I. General Charges A. Engineering i 388,148.20 ii 38,970.80 iii 10,956.00 iv 18,089.00 v 20,020.00 vi 128,200.00 7,947,590.79Eyes
(51.) Chief Resident Engineer.
COPY.
596
KOWLOON-CANTON HAILWAY.
25111
IREC
REGE 15 JUL 07
Eritish Section.
Revised Estimate of Line not including Workshops, Kowloon Station
Building, Private Sidings or Deep Sea Wall.
Main bead.
Sub Head.
Survey
Land
Formation
A. sarthwork
F. funnels
C. roads
Bridges
A. Major
B. Minor
C. Calverts
V.
Fencing
A. Boundaries
E. Signs
1.
Telegraph
11.
Track
A. Eallast
E. Permanent Way
. Stations and Buildings A. Euildings and Fixtures
B. Station Machinery
0. Furniture
D. Workshops
IX. Plant
A. Construction
B. Loco tools and Plant
C. Carriage and Bagon D. engineering
H
H
*. Loco Holling Stock
F. C. & N. Kolling Stock
Estirate.
$45,00000
139,700 00
2,342,204 00 3,208,41500 88.500 100
538,500 43 473,388 11 88,882 00
31,818.00
398 00
28.964 00
747,03200 154,110 | 00
223,398 | 25
39,580 100
2,410 00
234.037 00
1. General Charges
A. Engineering i
388.148 | 20
ii
38,970 80
ili
10,956 00
iv
18,089 00
V
20,020 00
V1
128,200 00
7,947,590 79.
Eves
(51.) chiar Xesident sngineer.