KOWLOON-CANTON RAILWAY.

25111

IREC

REGE 15 JUL 07

British Section.

Revised Estimate of Line not including Workshops, Kowloon Station Building, Private Sidings or Deep Sea Wall.

Main Head. Sub Head. Estimate. Survey $45,000.00 Land 139,700.00 Formation A. Earthwork 2,342,204.00 F. Tunnels 3,208,415.00 C. Roads 88,500.00 Bridges A. Major 538,500.43 B. Minor 473,388.11 C. Culverts 88,882.00 V. Fencing A. Boundaries 31,818.00 B. Signs 398.00 VI. Telegraph 28,964.00 VII. Track A. Ballast 747,032.00 B. Permanent Way 154,110.00 223,398.25 39,580.00 2,410.00 VIII. Stations and Buildings A. Buildings and Fixtures 234,037.00 B. Station Machinery C. Furniture D. Workshops IX. Plant A. Construction B. Loco tools and Plant C. Carriage and Wagon D. Engineering X. Loco Rolling Stock F. C. & W. Rolling Stock I. General Charges A. Engineering i 388,148.20 ii 38,970.80 iii 10,956.00 iv 18,089.00 v 20,020.00 vi 128,200.00 7,947,590.79

Eyes

(51.) Chief Resident Engineer.

Edit History

2026-06-04 20:08:22 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
596 KOWLOON-CANTON RAILWAY. 25111 IREC REGE 15 JUL 07 British Section. Revised Estimate of Line not including Workshops, Kowloon Station Building, Private Sidings or Deep Sea Wall. Main Head. Sub Head. Estimate. Survey $45,000.00 Land 139,700.00 Formation A. Earthwork 2,342,204.00 F. Tunnels 3,208,415.00 C. Roads 88,500.00 Bridges A. Major 538,500.43 B. Minor 473,388.11 C. Culverts 88,882.00 V. Fencing A. Boundaries 31,818.00 B. Signs 398.00 VI. Telegraph 28,964.00 VII. Track A. Ballast 747,032.00 B. Permanent Way 154,110.00 223,398.25 39,580.00 2,410.00 VIII. Stations and Buildings A. Buildings and Fixtures 234,037.00 B. Station Machinery C. Furniture D. Workshops IX. Plant A. Construction B. Loco tools and Plant C. Carriage and Wagon D. Engineering X. Loco Rolling Stock F. C. & W. Rolling Stock I. General Charges A. Engineering i 388,148.20 ii 38,970.80 iii 10,956.00 iv 18,089.00 v 20,020.00 vi 128,200.00 7,947,590.79 Eyes (51.) Chief Resident Engineer.
Baseline (Original)
COPY. 596 KOWLOON-CANTON HAILWAY. 25111 IREC REGE 15 JUL 07 Eritish Section. Revised Estimate of Line not including Workshops, Kowloon Station Building, Private Sidings or Deep Sea Wall. Main bead. Sub Head. Survey Land Formation A. sarthwork F. funnels C. roads Bridges A. Major B. Minor C. Calverts V. Fencing A. Boundaries E. Signs 1. Telegraph 11. Track A. Eallast E. Permanent Way . Stations and Buildings A. Euildings and Fixtures B. Station Machinery 0. Furniture D. Workshops IX. Plant A. Construction B. Loco tools and Plant C. Carriage and Bagon D. engineering H H *. Loco Holling Stock F. C. & N. Kolling Stock Estirate. $45,00000 139,700 00 2,342,204 00 3,208,41500 88.500 100 538,500 43 473,388 11 88,882 00 31,818.00 398 00 28.964 00 747,03200 154,110 | 00 223,398 | 25 39,580 100 2,410 00 234.037 00 1. General Charges A. Engineering i 388.148 | 20 ii 38,970 80 ili 10,956 00 iv 18,089 00 V 20,020 00 V1 128,200 00 7,947,590 79. Eves (51.) chiar Xesident sngineer.
2026-06-04 20:08:22 · Baseline
View content

COPY.

596

KOWLOON-CANTON HAILWAY.

25111

IREC

REGE 15 JUL 07

Eritish Section.

Revised Estimate of Line not including Workshops, Kowloon Station

Building, Private Sidings or Deep Sea Wall.

Main bead.

Sub Head.

Survey

Land

Formation

A. sarthwork

F. funnels

C. roads

Bridges

A. Major

B. Minor

C. Calverts

V.

Fencing

A. Boundaries

E. Signs

1.

Telegraph

11.

Track

A. Eallast

E. Permanent Way

. Stations and Buildings A. Euildings and Fixtures

B. Station Machinery

0. Furniture

D. Workshops

IX. Plant

A. Construction

B. Loco tools and Plant

C. Carriage and Bagon D. engineering

H

H

*. Loco Holling Stock

F. C. & N. Kolling Stock

Estirate.

$45,00000

139,700 00

2,342,204 00 3,208,41500 88.500 100

538,500 43 473,388 11 88,882 00

31,818.00

398 00

28.964 00

747,03200 154,110 | 00

223,398 | 25

39,580 100

2,410 00

234.037 00

1. General Charges

A. Engineering i

388.148 | 20

ii

38,970 80

ili

10,956 00

iv

18,089 00

V

20,020 00

V1

128,200 00

7,947,590 79.

Eves

(51.) chiar Xesident sngineer.

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.